1、投標(biāo)函Bid書Listof一、投標(biāo)保證金B(yǎng)idit.Alistof投標(biāo)函Bid書Listof一、投標(biāo)保證金B(yǎng)idit.Alistofreferencetcanbe12臨時設(shè)施TemporaryFacilities3生產(chǎn)廠房4品庫DangerousMaterial5自行車棚Bicycle6廢水處理站W(wǎng)asteWaterTreatment7其他工作Other8UnitPricefor9ConstructionPlantandEquipment10UnitPriceof五、主要分包情況Alistofmain Alistofachine&equipmenttobe八、項目管理施工方案ProjectIn
2、stallation1、編制依據(jù)Basisof21.1編制說明Descriptionof1.2編制依據(jù)Basisofroductionoftheprojectandconstruction2.1roductionofthe2.21.1編制說明Descriptionof1.2編制依據(jù)Basisofroductionoftheprojectandconstruction2.1roductionofthe2.2工程難點及主要對策DifficultyoftheWorkand3、總體施工部署Generalconstruction3.1項目總體指導(dǎo)方針Generalguidelinesofthe3.2 3
3、.3施工順序安排Arrangementforconstruction Objectivesofduration,quality,safetyand Managementpolicyofsafety,ng,environmentalprotection,firepreventionandofconstruction MeasuresfortreatmentandPre-arrangedplanningfor CoordinationwiththeEmployer,Supervisor,DesignerandGeneral3.8服務(wù)承諾Service4、施工準(zhǔn)備工作計劃Workingschemef
4、orconstruction4.1 4.2勞動力準(zhǔn)備oflabor5、主要施工方法和技術(shù)措施Mainconstructionmethodandtechnical5.1屋、墻檁條及次結(jié)構(gòu)Roof,wallpurlineand5.2屋、墻檁條及次結(jié)構(gòu)Roof,wallpurlineand35.3 屋面下層板Lowerroof5.4屋面上層板和保溫棉Upperroofplateandinsulatedernalandexternalwallpanelandglass5.6門窗系統(tǒng)安裝Installationofdoorandwindow5.3 屋面下層板Lowerroof5.4屋面上層板和保溫棉Up
5、perroofplateandinsulatedernalandexternalwallpanelandglass5.6門窗系統(tǒng)安裝Installationofdoorandwindow5.7排煙天窗安裝Emergencyvent6、主要材料、工具及勞動力安排Arrangementofaterials,toolsand7、施工現(xiàn)場布置Construction anizationmeasurestoensurethesafety anizationnetworkdiagramforsecurity8.2現(xiàn)場安全施工的要求Requirementsofsafetyconstructionon 9.1
6、esofengineering9.2質(zhì)量管理制度Qualitycontrol9.3工程質(zhì)量控制程序圖Qualitycontrolschartof9.4質(zhì)量保證體系Quality Qualitymanagementsystemandquality9.6設(shè)計質(zhì)量保證措施Designqualityrance9.7原材料檢測及質(zhì)量保證措施Rawmaterialdetectionandqualityrance9.8rancemeasuresduringion,packing,loadingandunloadings9.9工程材料檢驗措施Engineeringmaterialsinspection9.10
7、金屬屋面施工質(zhì)量檢驗措施Qualityinspectionmeasuresofmetal4Theguaranteeoftechnicalanizationmeasuresof Theestablishmentofguaranteeschedulemanagement Theguaranteeoftechnicalanizationmeasuresof Theestablishmentofguaranteeschedulemanagement Primaryresponsibilitiesofelementsofguaranteeschedulemanagement 11.1文明施工管理目標(biāo)Ma
8、nagementobjectivesofcivilized 11.3文明施工措施Civilizedconstruction11.4 環(huán)境保護(hù)措施Environmentalprotection12、雨季及防風(fēng)施工措施Constructionmeasuresforrainyseasonandwind12.1雨季施工措施Constructionmeasuresforrainy12.2、防風(fēng)施工措施Constructionmeasuresforwind 2、通長無搭接Noalongthewhole3、屋面板單方向膨脹收縮UnidirectionalorContractionofRoof4、屋面板預(yù)打膠
9、技術(shù)Pre-gluetechnologyforRoof5、FM認(rèn)證FM6、高空生產(chǎn)5十一、設(shè)計深化圖紙Depthdesign1、版型圖Panel1.1CSS- 十一、設(shè)計深化圖紙Depthdesign1、版型圖Panel1.1CSS- 2、屋面構(gòu)造圖Roofconstructionalfabricdetail 4、高低跨節(jié)點Spanwithdifferentheightdetail 7、門窗上下收邊節(jié)點Door Windowstopandbottomflashingdetail8、門窗側(cè)收邊節(jié)點Door eflashingdetail9、屋面外天溝節(jié)點Roofingoutsidegutter.
10、10、天窗骨架詳圖Skylightframedetail11、雨棚節(jié)點Platformawningdetail十二 、合理化建議Reasonable1、中脊雙層收邊Roofcladdingwithdoublesteelsheetflashingon of 6投標(biāo)函Letterof.Wehaveexaminedthes.Wehaveexamined,understoodandcheckedsandhave tthey投標(biāo)函Letterof.Wehaveexaminedthes.Wehaveexamined,understoodandcheckedsandhave ttheycontainnoer
11、rorsorotherdefects.Wehave investigatedthesite,andgotfull understanding of site condition. We accordingly offer to execute and complete the Works remedy any defects therein, in conformity with s and our enclosed bid (including letter)forthelumpsumetoutin our For the work he s, we offer a lump sum pri
12、ce of 18861361.65 constructionperiodof110calendarWe agree to abide by this bid until January 21, 2016 and it shall remain binding upon us and may acceptedatanytimetIf this offer is accepted, we will provide the specified Performance Bond;enter the site and preparation works before constructionas soo
13、n as receive Letter ent; and complete the Works accordance with the above-s he Time for Completion. We t Workswillthenconformhe7WetyouarenotboundtoacceptthelowestoranytenderyoumayWetyouarenotboundtoacceptthelowestoranytenderyoumay teraldulyauthorizedtosigntendersforandonbehalfofYeShuzhou.地址日期2015 10
14、 21 Companyofthe8書.In t your project can be executed smoothly, we, GROUP ), wouldherewith liketomakethefollowingsolemn 書.In t your project can be executed smoothly, we, GROUP ), wouldherewith liketomakethefollowingsolemn 145 、For your “The technical Innovation and Project with Annual output of 1.45
15、HighQualitySanitaryWareofDURAVIT(China)SanitaryWject“,locatedLandCodeC-11,PartBofLIP(attheareaofRoadYuanquAvenueandBeitingHengxian),neverbidbythe nameofanyotherconstructioncompanyinanycase.Inaddition,wenever other companies s to use our or businiss lecense, to bid for 。All the project manangement me
16、mbers, listed in our , are our employees, who already signed formal employement contracts with us. Nobody is external staff notformallyhiredbyus.Additionaly,unlessweclearlyedinour ,allthememberswillworkonsite fulltime east 5days kand8 hours perday), after we During project execution, if theres any b
17、reach of our abovementioned commitment, you have the right to cancel our bidding qualification, winning qualification, or take relevant economic penalty measures, or even terminate the already signed construction contract.9Biddersname:ythe Biddersname:ythe Chopor signaturebylegal日期:2015 1021Date:Oct
18、ober21,iveorauthorized DCN2 詳見附件一。SeetheDCN2 詳見附件一。Seethe澄清文件列Listofs澄清文件列Listofs詳見附件二。SeetheitInformationofitBofNameofitBeijingeconomicanddevelopmentzoneBitInformationofitBofNameofitBeijingeconomicanddevelopmentzoneBLongqingstreet,Beijingeconomictechnologicaldevelopmentzoneno.Addressofitt.Alistofre
19、ferencetcanbeProjectProject1ChongqingBOEAlistofreferencetcanbeProjectProject1ChongqingBOE8.5generationof newsemiconductordisplaydevice and system project6.2 2014 8August2重慶江北機(jī)場T3 航站樓 ChongqinJiangbeiAirportterminal 16 年 July3Beijing Benz auto co.,base construction projects60 2013 5May4Yingkouzhongwa
20、ngaluminum7.5 2015 2Yingkou city, 5Voith drive technology system (Shanghai) co.,.,anewfactory2 2015 6June詳見附件三。Seethe詳見附件三。Seethe詳見附件四。Seether詳見附件五。Seether詳見附件五。SeetheAlistofachine&equipmenttoAlistofachine&equipmenttobe詳見附件六。Seethe is formulated for the steel structure enclosure system for the plant
21、 of the innovationandproject is formulated for the steel structure enclosure system for the plant of the innovationandprojectnnualoutputof 1.45 millionhighqualitysanitarywareDURAVIT(China) Sanitary Ware . The construction shall be subject to the national and specificationsandstandardsaswellasthecons
22、tructionsthroughoutthe National,departmentandlocaltechnicalspecificationsand“Unifiedstandardforreliabilitydesignofbuilding “Loadcodeforbuilding“Codeforseismicdesignofbuildings“Codeforbuildingdesignfireprotection“CodeforDesignofindustrialbuildings sofengineeringconstructionstandards “Glasswoolproduct
23、sforbuildinginsulation“Safetycodeersupplyandconsumptionfor “Glasswoolproductsforbuildinginsulation“Safetycodeersupplyandconsumptionfor “Unitystandardofcheckandacceptanceforthequalityofbuildingand“Technicalcodeforsafetyofsteeltubularscaffoldwithcouplersin“Technicalcodeforsafetyofhighoperationin “Code
24、forengineering“CodeforConstructionQualityAcceptanceofSteel“TechnicalSpecificationforWeldingofSteelStructureof“CodeforQualityAcceptanceofRoof“CriteriaforSafetyTechnologyofGantryCranesandHeadframe “QualityGuaranteeMethodofHouseBuilding“CriteriaforSafetyTechnologyofGantryCranesandHeadframe “QualityGuar
25、anteeMethodofHouseBuilding(1)QualitySafetyManualofthe(2)Projectmanagementrulesandregulationsofthe(3) Construction management and experience of the Company. The Company has construction technical products and technology for the design, manufacturing and installation of roof/wall purlin and enclosure
26、system and with which the n and skilled workers have equippedwith. The Companycontrols installation qualityand safetyinconstruction ona strict basis givingdetailedtechnicaldisclosurestrictmanagementtothe;(4)Construction isrequiredatseveralareasasthesiteduration isshort.Theconstructionattheersectionm
27、ustbereasonablyprovidedtosatthese;(5) Both the anizations and the work heir construction at the same leading to multiple cross operations on the construction site. Coordination shall be provided harmonize the construction sequence of the anizations and the teams for e accelerating the siteharmonize
28、the construction sequence of the anizations and the teams for e accelerating the site progress. For instance, the next procedure shall not begin until the procedure delivered and accepted as an approved one after the main structure construction of steel structure completed. The construction of sub-s
29、tructure including the roof and wall purlin and enclosure shall be transferred to the door and window construction teams after the procedure is delivered acceptedasanapprovedoneuponcompletionofroof,wallpanelandflashingconstruction;(6)TheCompanyhas set higherrequirements for the qualityobjective ofro
30、ofandwallfor the Works. Preparation and design must be given on a careful basis for strict control of the construction quality. Stringent requirements shall be given to the workers when the roof panel external wall panels are installed. The ing and installation of panels and panels shall controlled.
31、Theconnectionofroofandwallshallberoductionoftheprojectandconstructionroductionofthe Name of project: The technical Innovation and Project nnual output of .建設(shè)地點:珞璜工業(yè)園區(qū)B區(qū)C-11號地塊(園區(qū)大道與碑亭橫線交界處Project Name of project: The technical Innovation and Project nnual output of .建設(shè)地點:珞璜工業(yè)園區(qū)B區(qū)C-11號地塊(園區(qū)大道與碑亭橫線交界處
32、Project address: Land Code C-11, Part B of LIP (at the area of Road Yuanqu Avenue Floor area: This project is the phase I of the new factory including the office building and building with the construction area is 6061m, the workshop is 54608m, the chemical warehouse 154m,thewastestorageis381m,thewa
33、stewatertreatmentplantis72.5m,thebicycleshedisthe guardhouse is 164m, the roof of the plant steel structure enclosure is 39844m and the wall Contractperiod:110Contentsofconstruction:ThescopeofworkoftheProjectincludesthefollowingitemsofthesteelstructureenclosure system,including:sub-structuresuchasro
34、of/wallpurlin,kneebrace, stay,bar, t,door sill; roof/wall double-layer color plate, insulated cottonand ing; canopyupper/lower lates, ing, gutter, door and window; detail design of wall panel, TheWorksrelatestodetaildesignintyofroof/wallpurlinandpanels.Inaddition,workloadsof designand time re occur
35、fficient time is requiredforproduction,workingTheWorksrelatestodetaildesignintyofroof/wallpurlinandpanels.Inaddition,workloadsof designand time re occur fficient time is requiredforproduction,workingsiteinstallationandthemustbe Forthesereasons,theCompanyhasassignedthebestdesignteamfortheProjectwhich
36、consists2 designers and where the Design Director of the Company is the for design of Projectsoastoachieveermsnelof Thesub-structureincludingtheroof/wallpurlin,stayandbattenis375.3Tinweight.Theroofcovers an area of 39,844m and the wall panel covers an area of 11470m, the production manufacturingof b
37、oth of which require cooperation of the Company departments in order to materialsupplyandWehaveadvantagesoverthefollowingtosolvethesaid(1)Purchasingadvantage:Wehavealwaysadhered to theprinciples ofcentralized material pertimesoastopreventcolor differenceofcoatingdueto multiple purchases ofsteelcoils
38、which toeffectonaestheticsofthearchitectureasa (2) Cooperation advantage:We usesteel coils of n 5 million square meterseach year. have established long-term and good partnership with steel coil manufacturers, fully guarantying demandformaterialsofthe(3)Economic strength:We arestronginerto tthepurcha
39、seof thecanbecompletedbyone (4) Machining advantage: We have top-ing purlin and color plate sing equipment sufficient skilled operators(3)Economic strength:We arestronginerto tthepurchaseof thecanbecompletedbyone (4) Machining advantage: We have top-ing purlin and color plate sing equipment sufficie
40、nt skilled operators and modern factories to tt materials purchased can sed on a centralized basis for timely supply of materials in case of time re and supplyofmaterialsincaseofaccelerationconstructionofthe (1) The sub-structure including roof/wall purlin he specification and type, resulting ection
41、 and installation on site. Component numbering, classification packaging by the factory shall be normalized and site material management shall be strengthened prevent materials from putting in disorder. Lifting equipment such as cranes shall be used byareas anizations on site to put the component in
42、 place for minimized transport by labor (2) For construction of all the lower roof plates, these lates shall be inserted in part to seam n the roof purlin and beam after they are installed at the roof beam and cut. High loadsandseveralspecificationsshallbeprovidedonsite.Theoveralleffectoftheselatesw
43、illaffectedif not properly dealt with. For this reason, ayout shall be design tocontrol occurrence abnormalplate.tyofplatesshallbeproducedatfactories.Detaileddisclosurebemadetoconstructionteamsbefore(3)Theareawhosegroundconditiondoesnotpermituseofmovablescaffoldduringinstallationlower roof plate sha
44、ll be constructed by using baskets or hangers. If there(3)Theareawhosegroundconditiondoesnotpermituseofmovablescaffoldduringinstallationlower roof plate shall be constructed by using baskets or hangers. If there are he effect,constructionprogressorsafetycontrol,inparticularumeffectonconstructionof t
45、he lower roof plate, a thorough Method ement shall be determined prior to construction detailed technical disclosure and strict management shall be given to constructors on site for controlofinstallationqualityandsafetyin。(4)Construction isrequiredatseveralareasasthesite duration is short.Theconstru
46、ction attheersectionmustbereasonablyprovidedtosatthese;(5) Both the anizations and the work heir construction at the same leading to multiple cross operations on the construction site. Coordination shall be provided harmonize the construction sequence of the anizations and the teams for e accelerati
47、ng the site progress. For instance, the next procedure shall not begin until the procedure delivered and accepted as an approved one after the main structure construction of steel structure completed. The construction of sub-structure including the roof and wall purlin and enclosure shall be transfe
48、rred to the door and window construction teams after the procedure is delivered acceptedasanapprovedoneuponcompletionofroof,wallpanelandflashing(6)TheCompanyhas set higherrequirements for the qualityobjective ofroofandwallfor the Works. Preparation and design must be given on a careful basis for str
49、ict control of the construction quality. Stringent requirements shall be given to the workers when the roof panel external wall panels are installed. (6)TheCompanyhas set higherrequirements for the qualityobjective ofroofandwallfor the Works. Preparation and design must be given on a careful basis f
50、or strict control of the construction quality. Stringent requirements shall be given to the workers when the roof panel external wall panels are installed. The ing and installation of panels and panels shall controlled.Theconnectionofroofandwallshallbe、總TheCompanymakesefforts tocompletingdesign,sing
51、andinstallationon a t ty, duration and safety are guaranteed according to characteristics of Works.Forthisreason,theCompanywillsetupaProjectLeadingGroupoftheWorksconsistingofbranchGeneral Manager and department managers egrated management of business, manufacturingsing,transport,installationandquali
52、tyranceoftheWorkstoastofullyall sary for the Works including technology, s, material sing equipment, of labor , quality control and ion installation as well as cooperation with the Employer, project management company, SupervisorandConstructor.Tobespecific,thebranchGeneralManageractsasof the Project
53、 for specific plans and ion of tasks. The functional departments musttherequiredbytheWorksandfinishalltasksoftheWorksona stringentbasis.with much construction experience, good competencies and excellent communication s as Site Project Manager of the Works for installation construction on site so as
54、to complete the manufacturing,singandWe will assign a construction t is strong in alism, has excellent technical and has been engaged in several major tructure construction for year for the and installation to reflectmuchWe will assign a construction t is strong in alism, has excellent technical and
55、 has been engaged in several major tructure construction for year for the and installation to reflectmuch importance theCompanyattach to and the responsibilityfor theIn addition, we have made careful deployment for the of Company Management, number nel,coordinationoftypeofwork,production/manufacturi
56、ngandinstallationyzingtheWorksandcalculatingties.Wearefullycapabletocomplete the ContractSectiononaiveandsafebasisaccordingtoourexistingcapacityofproductionand We have set up a l Project Leading Team for normal operation of detail design, manufacturingandsite installation,etc. of theWorks.Fordesign,
57、wehave providedadesign teamhighqualityandexcellentskillsfor the Project;forproduction, we haveassigned the shopwith strong capacity of production management; for site installation, we have assigned the managementsengagedinconstructionmanagementforanizationoftheProjectandfunctionalofanizationchartoft
58、heCompanysProjectLeadinganizationchartoftheCompanysProjectLeading設(shè)(1)ProjectLeading。Guide pre-work technical, equipment, material and labor force preparations for the Project; guide (1)ProjectLeading。Guide pre-work technical, equipment, material and labor force preparations for the Project; guide su
59、pervise ion management of the Project to t the Project is executed in DeputySafetyDesignQuality ConstructioPurchasin gDeptofCommerce& DataProjectLeadingGroupofthe accordance with the contract with the Employer. It consists of the members of including notlimitedtothebranchGeneralManager,CFO,CBO,Desig
60、nDirectorandEngineering(2)Projectaccordance with the contract with the Employer. It consists of the members of including notlimitedtothebranchGeneralManager,CFO,CBO,DesignDirectorandEngineering(2)ProjectThe Project Manager acts nt of the business entity for the Project, who is authorized by Legal iv
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 大連航運職業(yè)技術(shù)學(xué)院《中外文學(xué)經(jīng)典導(dǎo)讀》2023-2024學(xué)年第一學(xué)期期末試卷
- 《跨境電子商務(wù)》課件 第二章 跨境電子商務(wù)理論
- 四川工商學(xué)院專任教師招聘考試真題2024
- 北京市大興區(qū)西紅門醫(yī)院用工招聘筆試真題2024
- 2024年衢州市衢江區(qū)衛(wèi)生健康系統(tǒng)事業(yè)單位招聘考試真題
- 2024年昌都市人民醫(yī)院招聘考試真題
- 統(tǒng)編人教版三年級語文下冊《花鐘》示范公開課教學(xué)課件
- 兒童營養(yǎng)不良的飲食干預(yù)措施
- 兒童哮喘的診斷與維持治療
- 工程場景規(guī)范培訓(xùn)
- 醫(yī)院感染管理制度培訓(xùn)
- 防風(fēng)固沙造林施工承包合同
- 2024進(jìn)戶門、單元門、防火門采購及安裝合同 標(biāo)準(zhǔn)版 模板
- 詳盡的委托協(xié)議書范本
- 《工業(yè)園區(qū)物業(yè)服務(wù)》課件
- 新版中國食物成分表
- 鋼結(jié)構(gòu)工程安裝勞務(wù)合同
- 團(tuán)員發(fā)展紀(jì)實簿
- 機(jī)動車查驗員(中級)職業(yè)鑒定理論考試題及答案
- 國開(貴州)2024年秋《地域文化(專)》形考任務(wù)1-2答案
- 采油工(信息化)高級技能鑒定理論考試題及答案
評論
0/150
提交評論